Budget allocation calculator
Enter a total budget and production type to see reference allocations by department instantly. You can change the percentage for any item, and the other items are recalculated proportionally.
About these ratios: The ratios below are common reference allocations and are not official or industry standard figures; actual budgets must be adjusted to the project content, team size and quotes. This tool does not cite statistics or surveys from any organisation and only offers a starting point you can change. Everything you enter stays in your browser and is not uploaded.
Total budget
HK$0
Production type
—
Shoot days
—
Average per shoot day
HK$0
| Department | Percentage | Allocated amount |
|---|---|---|
| Total | 100% | HK$0 |
What contingency is for: unforeseen costs such as overtime, weather rescheduling, equipment damage or reshoots. The tighter the budget and the less controllable the shooting conditions, the less this line should be squeezed.