First, think about who reads it
The same call sheet is read in at least five ways. Cast look only at their own pick-up and on-camera times; the lighting department looks at power, location and the expected wrap; the production manager looks at meal numbers and vehicles; the art department looks at the props needed tomorrow; the director looks at whether the scene order makes sense. A good call sheet lets all five find their own line within ten seconds.
That is why layout matters on a call sheet: information with no sections, the same type size throughout, key times buried mid-paragraph, all of it forces everyone to read every line. Nobody on set reads every line.
The fields of a complete call sheet
The fields are listed below by section. Productions of different sizes can drop some, but the order of the sections should not be shuffled freely, because crews are used to finding information from top to bottom.
1. Header
- Title (or project name) and shoot day (day X of Y)
- Date and day of the week, with that day's weather forecast and sunrise and sunset times
- Unit call time and actual shooting call, written separately
- Estimated wrap time
- Names and phone numbers of the director, assistant director, and producer or production manager
Sunrise and sunset times have a practical use. When to shoot an exterior dusk scene, by when day scenes must be finished, and from what time you will need lights are all worked back from these two numbers.
For sunrise and sunset times in Hong Kong, check the Hong Kong Observatory almanac; for the weather, see the Observatory's 9-day weather forecast.
2. Locations and transport
- The full address of the unit base, and where the actual entrance is (the back-lane entrance of a building and its main entrance are two different things)
- The address of every location that day, and the travel time between them
- Public transport directions and parking arrangements: where you can park, any time limits, and where the loading bay is
- Base facilities: make-up room, changing area, equipment storage, toilets, rest area
- The rain or bad-weather backup, and who decides when to switch to it
3. Scenes for the day
List them in the actual shooting order. Each scene should have: scene number, day or night, interior or exterior, set name, a one-line description, the cast involved, the estimated shooting window and the location. If there are storyboard numbers, add them too.
4. Cast
Number the cast to match the scene list, and give each cast member three times: pick-up or report time, make-up and wardrobe time, and expected on-camera time. Giving only the on-camera time is the most common mistake: the actor arrives on time, but hair and make-up take longer and the whole crew waits.
5. Department call times and notes
Camera, lighting, sound, art, wardrobe, make-up, props, special effects, animal trainers and extras often do not arrive at the same time. Departments that need to set up early should have their own call times, along with that day's special notes: power tie-ins needed, roads to be closed in advance, naked flames or smoke, water work or work at height, children or animals taking part.
6. Meals and supplies
Meal times, number of meals, vegetarian and allergy needs, and water. The numbers should match the people actually on set that day, including drivers and extras.
7. Safety and emergencies
- The name and address of the nearest hospital, and the route there from base
- The phone number of the on-set emergency contact (usually the production manager or safety officer)
- Special risk notes for the day: height, water, moving-vehicle shots, naked flames, electrical load
8. Advance schedule
The location, approximate call time and main scenes for the next shoot day. This lets each department prepare ahead, and lets cast plan their own schedules.
The most common mistakes
- Giving the shooting call but no unit call. Between the two come set-up, equipment, and hair and make-up, which often take more than an hour.
- Giving the name of the place but not the entrance. The real loading and crew entrances of large shopping centres, housing estates and industrial buildings are usually not where the navigation app points.
- Cast times not worked back from hair and make-up. The result is the whole crew waiting for one person who actually arrived on time.
- No rain cover. In Hong Kong's rainy season you will almost certainly need it for exterior scenes, and deciding at the last minute wastes half a day.
- Incomplete contact details. A nickname only, or a messaging app with no phone number, leaves no way to recover if someone cannot be reached on the day.
- The scene order changed, but the sheet still shows the old order. Any change to the running order must be reflected on the call sheet, or two versions will be circulating on set.
- No nearest hospital listed. Nobody reads this line normally; when it is needed, it is the only useful line.
- Unapproved locations listed as normal. A location whose approval has not arrived should be marked with its status, so the production manager knows to keep chasing.
- Working-hour limits for children and animals not noted. These limits directly change the shooting order for the day.
Format differences between Chinese-language and English-language crews
Hong Kong crews often work with both conventions, so agree which one you are using before the shoot.
| Item | Common practice on English-language crews | Common practice on Chinese-language crews |
|---|---|---|
| Call times | Crew call and shooting call listed separately | Written as 大隊集合 (unit call) and 開機 (roll), sometimes only one of the two |
| Scene description | Scene number, INT/EXT, DAY/NIGHT | Scene number alongside the three items 時/景/人 (time, set, characters) |
| Scene length | Counted in eighths of a page | Counted by scene; page counts are less common |
| Cast labels | Cast numbers matched to scenes | Character names written directly, or names with numbers |
| Document set | Call sheet and crew list as two separate documents | The crew list is often printed on the call sheet itself |
| Job titles | English abbreviations throughout | Mixed Chinese and English; technical titles mostly in English |
For mixed crews there is only one rule: each field uses one language and one definition. The whole sheet can be bilingual, but do not write crew call in half the sheet and 大隊集合 in the other half. They are two different time concepts, and mixing them guarantees someone gets it wrong.
Distribution timing and version control
A common practice is to send it out before wrap on the previous shoot day, or that evening at the latest; the first day's call sheet should go out earlier, because new crew need time to arrange transport. It can still change after it goes out, so version control matters more than distribution itself.
- Put the date and version in the file name: so anyone can see at a glance whether they have the latest one.
- Mark changes: label it as a revised version and mark the changed lines. Do not just send a new file that looks identical.
- Use one distribution channel only: everyone receives it in the same group chat or the same mailbox, so that nobody ends up with a different version because some read the group and others read email.
- Send a non-editable format: mainly PDF, so nobody changes a time on their own copy without telling anyone else.
- Ask for confirmation of receipt: especially from cast and freelancers. Follow up individually with anyone who has not replied the night before the shoot.
- Mind personal data: cast and crew phone numbers should not go to the whole crew indiscriminately. A common practice is two versions, with the one containing full contact details going only to the people who coordinate.
Do all of the above, and the call sheet turns from a "schedule sheet" into the shared reference for the day. When something goes wrong on set, the first thing that often happens is someone pulls out the call sheet, points at a line and says: it says so here. How clearly that line is written decides whether that moment solves the problem or starts an argument.
Frequently asked questions
Should the unit call and the shooting call be written separately?
Yes. Between the two come set-up, equipment, and hair and make-up, which often take more than an hour. Giving the shooting call but no unit call is one of the most common call sheet mistakes.
When should the call sheet go out?
A common practice is to send it out before wrap on the previous shoot day, or that evening at the latest. The first day's call sheet should go out earlier, because new crew need time to arrange transport.
Where can I check sunrise and sunset times?
For Hong Kong, check the Hong Kong Observatory almanac for sunrise and sunset times and the Observatory's 9-day weather forecast for the weather. When exterior dusk and day scenes must be finished is worked back from these two numbers.
References
- Hong Kong Observatory, Almanac 2026 index (sunrise and sunset times): www.hko.gov.hk/en/gts/astron2026/almanac2026_index.htm
- Hong Kong Observatory, 9-day weather forecast: www.hko.gov.hk/en/wxinfo/currwx/fnd.htm
The pages above were accessed on 31 October 2026.
Published May 2026. Last updated: 31 October 2026.
Pre-production documents to have before the shoot
From the brief to proof of insurance: which documents short films and commercial productions each need.
Permits and approvalsFilming permits in Hong Kong: which department to start with
Streets, parks, government buildings and waters each have their own channel. One note to see where to start.
InsuranceProduction insurance in Hong Kong: what is required
Equipment, public liability and personal accident cover, and who will ask to see your policy.
SchedulingBuilding the stripboard: from breakdown to daily groups
Grouping by set, day and night scenes, cast availability and company moves. Build the stripboard, then write the call sheet.